2015 Expansion of the production area to 8000 sqm

imi Standort Bilk Halle1 3Demand for innovative materials for high-quality interior design and in particular for trade fair and store design is increasing continually. This also includes demand for imi-materials. After the 2nd hall was built in 2011 to expand production capacities, H. Schubert GmbH "expanded" again in 2015 to enlarge its production area to approx. 8000 sqm. Development of a special export board for shipping to overseas locations was "imi"'s recent reaction to the increasing demand from the American and Asian area. Peter Schubert and his "imi-team" continue to prepare for the future with continuous development of new surfaces and product versions. The continually growing team always keeps an eye on the latest industry developmetns. Find your contacts here.